top of page

How to Prep for Exterior Painting

Prior to Tall Peak's Arrival;

  • Please let us know your paint colour choices (or sample selection) a week in advance

  • If any portion of work is to be done “per client direction” be sure to write a task list

  • Please return your signed forms and deposit promptly

  • Please inform Tall Peaks of parking options (on street, driveway; will a permit be required?)

  • Please make space available in a secure area for ladder and equipment storage

  • Please ensure crew access to electrical outlets and water (a hose).

  • Please clear items from the work area – including porches and decks (we are happy to assist)

  • Please turn off your alarm or explain how to disarm it if accidentally tripped

Count on the Tall Peaks Crew Treat Your Home and Yard With Respect

  • Tall Peaks Painting generally begin work at 8:00AM, though other arrangements may be made

  • Your crew will tidy and secure the work site at the end of each day

  • Trash will be neatly stored and removed periodically

  • We seek to provide exceptional customer service. As work progresses, please be sure to share any questions or concerns you may have, either with your project manager or Kyle Rooney, Production Coordinator at Tall Peaks Painting.

  • Our crews adhere to Provincial & Federal safety requirements wherever lead paint is present

  • If a lift will be used, please check with project manager for more information

  • Extra paint will be labeled and left on-site for future touch-up. Paint should be stored indoors to prevent freezing

before garage.png
after garage.png
exterior 3.jpg
WorksafeBC logo.jpg
Call us @
250-208-2550
Mon-Fri 8am-5pm PST
Sat. 9am-4pm PST
Sun. Closed
tp bg blue transparent.png

© 2020 Tall Peaks Painting Ltd.

2251 Riesling Dr. Abbotsford, BC V4W 0A6
bottom of page